Tunnel Schwäbisch Gmünd

Tunnel Schwäbisch Gmünd

Germany

Reinforcement gantry, arched formwork, full round formwork, intermediate ceiling formwork

Project duration: 2010 – 2011

KonstruktionFertigungLieferungMontage
Photovoltaic System Wildkogel

Photovoltaic System Wildkogel

Austria, Salzburg

Europe’s highest helioelectric power plant was erected under the most difficult conditions on top of the Wildkogel near to Neukirchen at a height of 2.200 m. The photovoltaic plant with a size of nearly 7.000 m² will generate 1.3 million kilowatt-hours per year and thus cover three quarters of the Wildkogel cable cars’ demand.

Project duration: 2010

KonstruktionFertigungLieferungMontage
Tunnel Waidhofen

Tunnel Waidhofen

Lower Austria

Kicker formwork, arched formwork, full around formwork, intermediate ceiling formwork

Project duration: 2010

KonstruktionFertigungLieferungMontage
Lainzer tunnel

Lainzer tunnel

Austria, Vienna

Reinforcement wagon

Project duration: 2010

KonstruktionFertigungLieferungMontage
Wattkopf Tunnel

Wattkopf Tunnel

Germany

Reinforcement wagon, arched formwork, niche formwork

Project duration: 2010

KonstruktionFertigungLieferungMontage

Page first page previous page  1  2  3  4  5  6  7  8  9  10  next page last page


© FEHBERGER STAHLBAU GmbH 2019 | A member of the Hinteregger group
Werbeagentur Gössler & Sailer

Our Projects

Koralmtunnel KAT2
Koralmtunnel KAT2
Arlbergtunnel ASAB
Arlbergtunnel ASAB
40 Years of Fehberger